The BePe pipelayer has been specially developed for the placement and demolition of sewers. The round mandrel is completely clad with PE, making the pipes even easier to place, and an extra-large rubber base ensures that you can position the pipe optimally. The pipelayer is available in a light and a heavy version and can therefore handle pipes up to 5000 kg.
• pick up pipes quickly – man on the side is no longer needed
• pipes are no longer damaged by plastic protective blocks
• pipe can then be pressed in the forward and downward direction
• different working angles are possible due to pivot point
• end plate can be rotated 90 degrees (laying from the side is possible)
• completely made of steel S355
• head plate made of 400 and 500 HB
Ideal in combination with our compaction wheel! Laying the new sewer!!